概述:我們都知道混凝土攪拌泵車的操作是有技術(shù)要求的,在操作時嚴格依照技能要求操作有利于提高施工效率而且躲避危險。以下是小編總結(jié)的攪拌一體
我們都知道混凝土攪拌泵車的操作是有技術(shù)要求的,在操作時嚴格依照技能要求操作有利于提高施工效率而且躲避危險。以下是小編總結(jié)的攪拌一體車的操作要求關(guān)鍵:
We all know that there are technical requirements for the operation of concrete mixing pump truck. Strictly following the technical requirements during operation is conducive to improving the construction efficiency and avoiding danger. The following is a summary of the key operation requirements of the mixer truck:
1、要確保操作人員精力高度集中
1. To ensure that the operator is highly focused
攪拌一體車的操作人員的精力狀況是很重要的。小型混凝土攪拌泵車操作人員在泵車施工過程中要確保精力的會集,時刻重視著泵車的各個參數(shù),尤其是攪拌一體車的壓力表的數(shù)據(jù)。一旦發(fā)現(xiàn)壓力表的數(shù)據(jù)反常要及時采納相應(yīng)的辦法,防止堵管現(xiàn)象,確保泵車的正常施工。假使呈現(xiàn)堵管現(xiàn)象,操作人員要及時按闡明進行處理或許聯(lián)絡(luò)生產(chǎn)廠家售后人員處理。
The energy status of the operators of the mixer truck is very important. Small concrete mixing pump truck operators should ensure the concentration of energy in the construction process of the pump truck, and always pay attention to the various parameters of the pump truck, especially the data of the pressure gauge of the mixer truck. Once abnormal data of pressure gauge is found, corresponding measures shall be adopted in time to prevent pipe blockage and ensure normal construction of pump truck. In case of pipe blockage, the operator should deal with it in time according to the instructions or contact the after-sales personnel of the manufacturer.
2、正確挑選泵送速度
2. Choose pumping speed correctly
欲速則不達。肯定不要由于趕工期等原因就在施工過程中把泵送速度調(diào)的過快。初次泵送時要分外留意,由所以初次運用,一切管道的阻力是比較大的,這是就需求采納低速泵送的方法,等候泵送現(xiàn)象正常后方可測驗漸漸進步泵送混凝土的速度。
More haste, less speed. Certainly do not because of rush period and other reasons in the construction process of pumping speed adjustment too fast. When pumping for the first time, special attention should be paid. Therefore, the resistance of all pipelines is relatively large in the first use. This is the need to adopt the method of low-speed pumping. Wait for the pumping phenomenon to be normal before gradually improving the speed of pumping concrete.
3、時刻操控好涂料量
3. Control the amount of paint at all times
在攪拌一體車的施工過程中,操作人員要時刻重視料斗中的涂料,不要讓涂料低于攪拌軸,當然也不要讓料斗中的涂料堆積的太多。這首要是由于假如料斗中的涂料太少就簡單在泵送過程中吸入空氣,然后導(dǎo)致堵管現(xiàn)象的發(fā)作。那么假如料斗中的涂料過多會怎樣呢?太多則不利于及時整理粗骨料和比較大的骨料,也會導(dǎo)致堵管的發(fā)作。
In the construction process of the mixer truck, the operator should always pay attention to the paint in the hopper, do not let the paint lower than the mixing shaft, of course, do not let the paint in the hopper pile up too much. This is mainly because if the paint in the hopper is too little, it is easy to inhale air in the pumping process, and then lead to the occurrence of pipe plugging phenomenon. So what if there is too much paint in the hopper? Too much is not conducive to the timely sorting of coarse aggregate and relatively large aggregate, and will also lead to the occurrence of pipe plugging.
4、處理好混凝土坍落度較小問題
4. Deal with the problem of small slump of concrete
在攪拌一體車的施工過程中,操作員一定要時刻重視料斗中混凝土的坍落度。假如在施工過程中發(fā)現(xiàn)料斗中的混凝土坍落度很小,無法進行正常的泵送時,操作員不能貪心省事兒采納強行泵送或許加水攪拌施工的辦法,這樣容易形成堵管從而影響施工的功率。那么該怎么處理呢?施工員應(yīng)該及時將混凝土攪拌料斗底部放掉。
In the construction process of mixer truck, the operator must always pay attention to the slump of concrete in the hopper. If it is found that the concrete slump in the hopper is very small in the construction process, and the normal pumping can not be carried out, the operator can not be greedy and trouble free, and adopt the method of forced pumping or water mixing construction, which is easy to form pipe plugging, thus affecting the construction power. So what should we do? The construction workers should release the bottom of the concrete mixing hopper in time.
5、管道問題要留意
5. Pay attention to pipeline problems
在攪拌一體車的施工過程中假如需求停歇,一定要操控好停歇時刻,不然管路中的混凝土凝結(jié)會形成接下來施工的不方便,容易形成堵管現(xiàn)象。此外,在小型混凝土攪拌泵車施工完畢后要及時進行管路的清洗,而且要確保管路清洗潔凈,防止下次運用時堵管。
In the construction process of the mixer truck, if it needs to stop, we must control the stop time, otherwise the concrete condensation in the pipeline will form the inconvenience of the next construction, and it is easy to form the pipe blocking phenomenon. In addition, after the construction of the small concrete mixing pump truck, the pipeline should be cleaned in time, and the cleaning of the pipeline should be ensured to prevent the blockage of the pipeline in the next operation.