水泥混凝土攪拌車(chē)噪音過(guò)大如何?
概述:水泥混凝土攪拌車(chē)經(jīng)過(guò)長(zhǎng)時(shí)間的運(yùn)用,可能會(huì)呈現(xiàn)噪音過(guò)大、制動(dòng)系統(tǒng)不良、剎車(chē)系統(tǒng)毛病、發(fā)起機(jī)不能正常運(yùn)轉(zhuǎn)等一系列問(wèn)題,技術(shù)人員要依據(jù)不
水泥混凝土攪拌車(chē)經(jīng)過(guò)長(zhǎng)時(shí)間的運(yùn)用,可能會(huì)呈現(xiàn)噪音過(guò)大、制動(dòng)系統(tǒng)不良、剎車(chē)系統(tǒng)毛病、發(fā)起機(jī)不能正常運(yùn)轉(zhuǎn)等一系列問(wèn)題,技術(shù)人員要依據(jù)不同的狀況作出剖析。噪音過(guò)大可能是每個(gè)司機(jī)都有遇到過(guò)的問(wèn)題,那么該怎樣處理呢?水泥混凝土攪拌車(chē)廠家處理混凝土攪拌車(chē)噪音過(guò)大方法:
After a long time of use, cement concrete mixer may present a series of problems, such as excessive noise, poor braking system, brake system fault, the initiator can not operate normally and so on. Technical personnel should analyze them according to different conditions. Excessive noise may be a problem encountered by every driver, so how to deal with it? Cement concrete mixer manufacturers to deal with excessive noise concrete mixer solution:
一、攪拌筒進(jìn)料口或出料口進(jìn)入異物:檢查并清理異物(平常用后也要留意清潔整理)
1、 Foreign matters entering the feeding or discharging port of the mixing drum: check and clean the foreign matters (pay attention to cleaning after use)
二、攪拌車(chē)齒輪間隙過(guò)大或齒斷裂:及時(shí)改換受損零件,調(diào)整間隙;
2、 Mixer gear clearance is too large or tooth fracture: timely change the damaged parts, adjust the clearance;
三、軸承彎曲或斷裂:沒(méi)方法,只要換掉了;
3、 Bearing bending or fracture: no way, as long as replaced;
四、水泥攪拌車(chē)?yán)鋮s水溫過(guò)低:看看節(jié)溫器,問(wèn)題太大要改換;
4、 Cement mixer cooling water temperature is too low: look at the thermostat, the problem is too big to change;
五、氣門(mén)漏氣或調(diào)整不當(dāng):能夠拆開(kāi)氣門(mén),停止恰當(dāng)調(diào)整,記住擰緊氣門(mén);
5、 Valve leakage or improper adjustment: be able to disassemble the valve, stop proper adjustment, and remember to tighten the valve;