概述: 我們都清楚自動(dòng)上料攪拌車安裝成功后盡量不要進(jìn)行拆卸,萬(wàn)一拆卸不當(dāng)會(huì)影響設(shè)備使用,但總是會(huì)有這樣那樣的原因,讓我們不得不對(duì)去其進(jìn)行
我們都清楚自動(dòng)上料攪拌車安裝成功后盡量不要進(jìn)行拆卸,萬(wàn)一拆卸不當(dāng)會(huì)影響設(shè)備使用,但總是會(huì)有這樣那樣的原因,讓我們不得不對(duì)去其進(jìn)行拆卸維修,那么拆卸前要做什么準(zhǔn)備?
We all know that the automatic feeding mixer should not be disassembled as far as possible after the installation is successful. In case improper disassembly will affect the use of the equipment, but there will always be such and such reasons that we have to disassemble and repair it. Then what should we prepare before disassembly?
拆卸前檢查:在拆卸
自動(dòng)上料攪拌車前,技術(shù)人員會(huì)對(duì)設(shè)備的使用情況和各系統(tǒng)的運(yùn)行情況進(jìn)行檢查,做好記錄,并采取切實(shí)可行的預(yù)防措施,隱患和避免拆卸過(guò)程中的意外損壞,造成不必要的經(jīng)濟(jì)損失。
Check before disassembly: before disassembly of automatic feeding agitator, technical personnel will carry out a comprehensive check on the use of equipment and the operation of each system, make a good record, and take feasible preventive measures to eliminate potential safety hazards and avoid accidental damage in the process of disassembly, resulting in unnecessary economic losses.
拆前保養(yǎng):為保證下次安裝時(shí)設(shè)備的正常運(yùn)行,必須對(duì)設(shè)備進(jìn)行拆前的整體清洗和上油保養(yǎng),保證每臺(tái)機(jī)器的潤(rùn)滑到位,以便為搬遷做準(zhǔn)備。
Pre-disassembly maintenance: in order to ensure the normal operation of the equipment during the next installation, the overall cleaning and oiling maintenance of the equipment must be carried out before disassembly to ensure the lubrication of each machine in place, so as to prepare for relocation.
一般需要檢查的主要部位:主機(jī)粉料稱重機(jī)卸料門、運(yùn)行時(shí)軸端潤(rùn)滑、主機(jī)卸料門、水泥倉(cāng)、粉煤灰倉(cāng)及螺桿機(jī)有舊料,粉倉(cāng)的卸料各秤的卸料口和卸料閥,配料機(jī)的卸料口,自動(dòng)上料攪拌車的外觀等部位。
General need to check the main parts: host powder weighing machine unloading door, running shaft end lubrication, host unloading door, cement bin, fly ash bin and screw machine with old material, powder silo unloading of each scale unloading port and unloading valve, batching machine unloading port, automatic feeding mixing car appearance and other parts.
作業(yè)現(xiàn)場(chǎng):現(xiàn)場(chǎng)路基為混凝土,自動(dòng)上料攪拌車周邊的膨潤(rùn)土、細(xì)砂、蓄水池等材料及設(shè)施,在拆機(jī)前一周內(nèi)全部清理完畢后運(yùn)出。確保施工現(xiàn)場(chǎng)無(wú)障礙物,并有足夠的空間進(jìn)行拆除工作。
Work site: the roadbed is concrete, bentonite, fine sand, reservoir and other materials and facilities around the automatic feeding mixer are all cleaned up and shipped out within a week before disassembly. Ensure that the construction site is free of obstructions and has sufficient space for demolition work.
有的自動(dòng)上料攪拌車工作效率越來(lái)越低,那么出現(xiàn)這一狀況的原因可能是因?yàn)闆](méi)有及時(shí)保養(yǎng)維修,再者或許是因?yàn)闆](méi)有正確的保養(yǎng),具體它還是有挺多的保養(yǎng)禁忌,比如忌機(jī)油只加不換;忌缸套和活塞新品不經(jīng)選配即安裝;忌不檢查柱塞行程余量。所以要求大家要對(duì)該設(shè)備保養(yǎng)以及會(huì)保養(yǎng),正確的方法非常重要,想了解的話就來(lái)
http://www.fxsgujg.cn咨詢吧!
Some automatic feeding mixer work efficiency is lower and lower, so the reason for this situation may be because there is no timely maintenance, and perhaps because there is no correct maintenance, specific it still has a lot of maintenance taboo, such as avoid oil only add not change; Avoid cylinder liner and piston new without matching that installation; Do not check the piston travel allowance. Therefore, we are required to maintain the equipment and will maintain, the correct method is very important, if you want to know about it, come to http://www.fxsgujg.cn consultation!