概述:我們都知道混凝土攪拌泵車的操作是有技術(shù)要求的,在操作時嚴(yán)格依照技能求要求操作有利于提高施工效率而且躲避危險。以下是小編總結(jié)的小型自
我們都知道混凝土攪拌泵車的操作是有技術(shù)要求的,在操作時嚴(yán)格依照技能求要求操作有利于提高施工效率而且躲避危險。以下是小編總結(jié)的小型自動攪拌車的操作要求關(guān)鍵:
We all know that there are technical requirements for the operation of concrete mixing pump truck, and the operation in strict accordance with the requirements of skills is conducive to improve the construction efficiency and avoid danger. The following is the summary of the small automatic mixer truck operation requirements key:
1、要確保操作人員精力高度集中
1. Make sure that the operator is highly focused
小型混凝土攪拌車的操作人員的精力狀況是重要的。小型混凝土攪拌泵車操作人員在泵車施工過程中要確保精力的會集,時刻重視著泵車的各個參數(shù),尤其是小型混凝土攪拌車的壓力表的數(shù)據(jù)。一旦發(fā)現(xiàn)壓力表的數(shù)據(jù)反常要及時采納相應(yīng)的辦法,防止堵管現(xiàn)象,確保泵車的正常施工。假使呈現(xiàn)堵管現(xiàn)象,操作人員要及時按闡明進行處理或許聯(lián)絡(luò)生產(chǎn)廠家售后人員處理。
The energy condition of operators of small concrete mixer is the most important. Operators of small concrete mixing pump truck should ensure the concentration of energy in the construction process of pump truck, and always pay attention to the parameters of pump truck, especially the data of pressure gauge of small concrete mixer truck. Once the abnormal data of pressure gauge is found, corresponding measures should be taken in time to prevent pipe blockage and ensure the normal construction of pump truck. In case of pipe blockage, the operator should handle it in time according to the instructions, or contact the manufacturer's after-sales personnel for treatment.
2、正確挑選泵送速度
2. Correct selection of pumping speed
欲速則不達??隙ú灰捎谮s工期等原因就在施工過程中把泵送速度調(diào)的過快。初次泵送時要分外留意,由所以初次運用,一切管道的阻力是比較大的,這是就需求采納低速泵送的方法,等候泵送現(xiàn)象正常后方可測驗漸漸進步泵送混凝土的速度。
More haste, less speed. Certainly not because of the rush period and other reasons in the construction process to adjust the pumping speed too fast. When pumping for the first time, we should pay special attention to it. Therefore, the resistance of all pipelines is relatively large during the first use. This is the need to adopt the method of low-speed pumping. After the pumping phenomenon is normal, we can test the speed of gradually improving the pumping concrete.
3、時刻操控好涂料量
3. Always control the amount of paint
在小型混凝土攪拌車的施工過程中,操作人員要時刻重視料斗中的涂料,不要讓涂料低于攪拌軸,當(dāng)然也不要讓料斗中的涂料堆積的太多。這首要是由于假如料斗中的涂料太少就簡單在泵送過程中吸入空氣,然后導(dǎo)致堵管現(xiàn)象的發(fā)作。那么假如料斗中的涂料過多會怎樣呢?太多則不利于及時整理粗骨料和比較大的骨料,也會導(dǎo)致堵管的發(fā)作。
In the construction process of small concrete mixer, operators should always pay attention to the coating in the hopper, do not let the coating lower than the mixing shaft, and of course, do not let the coating in the hopper accumulate too much. This is mainly due to the fact that if the hopper coating is too little, it is easy to inhale air in the process of pumping, and then lead to the occurrence of pipe blockage. So what if there is too much paint in the hopper? Too much is not conducive to timely finishing of coarse aggregate and relatively large aggregate, also can lead to pipe plugging.
4、處理好混凝土坍落度較小問題
4. Deal with the problem of small slump of concrete
在小型混凝土攪拌車的施工過程中,操作員一定要時刻重視料斗中混凝土的坍落度。假如在施工過程中發(fā)現(xiàn)料斗中的混凝土坍落度很小,無法進行正常的泵送時,操作員不能貪心省事兒采納強行泵送或許加水?dāng)嚢枋┕さ霓k法,這樣極易形成堵管從而影響施工的功率。那么該怎么處理呢?施工員應(yīng)該及時將混凝土攪拌料斗底部放掉。
In the construction process of small concrete mixer, the operator must always pay attention to the slump of concrete in the hopper. If it is found that the concrete slump in the hopper is very small in the construction process and normal pumping cannot be carried out, the operator can not be greedy and save time to adopt the method of forced pumping or water mixing construction, which is very easy to form pipe blockage and affect the power of construction. So what to do with it? The construction worker should release the bottom of the concrete mixing hopper in time.
5、管道問題要留意
5. Pay attention to pipeline problems
在小型自動攪拌車的施工過程中假如需求停歇,一定要操控好停歇時刻,不然管路中的混凝土凝結(jié)會形成接下來施工的不方便,極易形成堵管現(xiàn)象。此外,在小型混凝土攪拌泵車施工完畢后要及時進行管路的清洗,而且要確保管路清洗潔凈,防止下次運用時堵管。
In the construction process of small-scale automatic mixer, if it needs to stop, we must control the stop time, otherwise the concrete condensation in the pipeline will form the inconvenience of the next construction, and it is very easy to form the pipe blocking phenomenon. In addition, after the construction of the small concrete mixing pump truck, the pipeline should be cleaned in time, and the pipeline should be cleaned to prevent pipe blockage during the next use.